SFP-DD to SFP-DD-100G-AOC-1M3FT 100G SFP-DD 2 x 50G PAM4 Active Optical Cable, 1m (3ft)

SFP-DD to SFP-DD-100G-AOC-1M3FT 100G SFP-DD 2 x 50G PAM4 Active Optical Cable, 1m (3ft)

This SFP-DD to SFP-DD-100G-AOC-1M3FT compatible AOC cable provides a 100G direct connection for Generic equipment in a fixed 1m (3ft) configuration. The SFP-DD to SFP-DD assembly integrates both ends and the cable, giving data-center designers one defined product to evaluate for reach, rack layout, airflow and host compatibility.

OEM Part Number: SFP-DD to SFP-DD-100G-AOC-1M3FTHT Part Number: SFP-DD to SFP-DD-100G-AOC-1M3FT

Product Highlights

  • HT-manufactured AOC assembly in 1m (3ft)
  • 100G connectivity at 100Gbps
  • Interface configuration: SFP-DD to SFP-DD
  • Fixed length and part number: 1m (3ft), SFP-DD to SFP-DD-100G-AOC-1M3FT
  • Cable construction: OM4
  • Maximum power consumption: ≤3.5W
  • Minimum bend radius: 60mm

Specifications

HT Part NumberSFP-DD to SFP-DD-100G-AOC-1M3FT
ManufacturerHT
Connector TypeSFP-DD to SFP-DD
Max Data Rate100Gbps
Cable Length1m (3ft)
Cable TypeOM4
Wavelength850nm
Minimum Bend Radius60mm
Transmitter TypeVSCEL
Receiver TypePIN
Power Consumption≤3.5W
Power supply3.5V
CDR (Clock and Data Recovery)TX & RX Built-in CDR
Modulation Format2x 50G-PAM4 to 2x 50G-PAM4
DDM/DOMSupported
Commercial Temperature0 to 70°C (32 to 158°F)
ProtocolsSFP-DD MSA, SFP-DD MIS

Signal and Lane Configuration

The listed modulation format is 2x 50G-PAM4 to 2x 50G-PAM4. Both host interfaces must be configured for the same aggregate rate and lane arrangement. A connector that fits mechanically does not by itself guarantee that the remote port supports this encoding or breakout mode.

Data-Center Design and Airflow

Select the assembly by both reach and rack layout. A direct connection removes separate module-and-patch-cord interfaces, but it still needs a bend-safe pathway and clear connector access. Keep cable bundles from blocking front-panel airflow, account for the listed interface power where applicable and choose a length that supports maintenance without leaving an unmanaged coil. For this assembly, the minimum bend radius is 60mm; the stated power consumption is ≤3.5W.

Power and Thermal Planning

The rated power consumption is ≤3.5W. Include this load in the host-port power and thermal budget, especially in densely populated switches. Maintain front-panel clearance and do not bundle the cable so tightly that it obstructs airflow around the connectors.

Cable Construction and Routing

This assembly uses minimum bend radius 60mm. These mechanical characteristics affect how the cable should be dressed behind the equipment. Avoid sharp edges, excessive ties and repeated tight bends close to the connector boots.

Network and Protocol Considerations

The intended application is determined by the host interface and protocol support. Listed interface and protocol references include SFP-DD MSA, SFP-DD MIS. Confirm that the host firmware and port configuration support the same operating mode.

Integrated Optical Assembly

The optical engines and fiber are permanently integrated into this AOC. There are no detachable optical modules to clean or exchange. Handle the complete assembly by its connector housings and cable, and keep both ends matched to the same interface specification.

Length Selection and Installation Planning

At 1m (3ft), SFP-DD to SFP-DD-100G-AOC-1M3FT is a practical choice for direct connections within one rack. Route the cable along the intended management path rather than pulling it diagonally across adjacent connectors, and leave enough clearance for insertion, removal and front-panel airflow.

Position Within the Length Range

SFP-DD to SFP-DD-100G-AOC-1M3FT is the shortest of 12 verified length options in this family. It is the preferred choice when the port positions are close and cable slack must be kept to a minimum. The next option is SFP-DD to SFP-DD-100G-AOC-2M7FT at 2m (7ft), adding 1m for a less direct routing path; selecting it unnecessarily would leave more cable to dress.

Quality Assurance and Packaging

Each cable receives connector inspection and a functional link check before it is coiled with bend-safe slack and packed. Protective materials shield the connector housings during transport. Rack or project labels are available to keep length, part number and installation destination aligned. Volume orders can include customer references on the labels and carton list.

Ordering Information

Provide the OEM reference, HT part number, fixed length and quantity, together with the intended host interfaces. Rack-based quantities and packaging instructions can be included for larger deployments. Other lengths are separate products and should be entered on their own order lines. Keep SFP-DD to SFP-DD-100G-AOC-1M3FT associated with 1m (3ft) throughout the order and receiving record.

Generic Compatibility and Factory Testing

Compatibility confirmation combines host identification with actual link establishment and diagnostic checks. The assembly is prepared for the stated OEM reference rather than selected only by connector shape. For a new data-center deployment, the equipment model, port mode and software release provide the most useful basis for a pre-order review. Both connectors are examined before the operating test, which includes receive activity and diagnostic indications.

Frequently Asked Questions

Is this an original equipment manufacturer cable?

No. It is manufactured by HT under our own manufacturer identity.

Can excess cable be folded into a compact bundle?

No. Use a supported, bend-safe service loop and observe the listed minimum bend radius. Do not crease the cable or tighten ties around the connector boots.

Will any matching connector operate at the same speed?

Not necessarily. Both hosts must support the stated rate, identification, lane mapping and any required breakout configuration; mechanical compatibility alone is insufficient.

What details assist a compatibility review?

Provide the equipment manufacturer, model, port type, hardware revision and software release, together with the OEM reference, required length and quantity.

Shipping and Lead Time

Available stock is generally dispatched within one to three working days after order confirmation, with production lead times advised for larger quantities. Delivery can be arranged by courier, air freight or sea freight, and goods may instead be handed to an appointed forwarder or shipped on the customer’s courier account.


Featured Products


UAE Fiber Optics

UAE office: Abu Dhabi,Al khaleej Al Arabi
Factory add: ZYT industrial area, Shiyan, Baoan district, Shenzhen, China 518000

Popular Products

  • Fiber Optic Patch Cord
  • Fiber Optic Pigtail
  • Fiber Optic Attenuator
  • Fiber Optic Patch Panel
  • Fiber Optic Adapter

Products Datasheet

PDF catalogues of our products to download or for general inquiry, please send an email to sales@huihongfiber.com for details.

Customer Support

For customer support, please leave email to sales@huihongfiber.com, we shall reply to you as soon as possible.