Customized MTP-16 Trunk Cable, 16-256F, OS2
Customized MTP-16 Trunk Cable, 16-256F, OS2

This 16-256 Fibers (Base-16) MTP® Elite Female/Male trunk assembly is built for backbone cabling between racks, rows and distribution frames. OS2 9/125μm fiber, Plenum (OFNP)/LSZH jacket and factory installed pulling protection make it a one-pull replacement for hours of field termination work.

Available lengths are 2m (7ft), 3m (10ft), 5m (16ft), 10m (33ft), 15m (49ft), 20m (66ft), 25m (82ft) and 30m (98ft). We can also produce any intermediate or longer length to order, with your choice of labeling and packaging.

Product Highlights

  • MTP® Elite Female/Male to MTP® Elite Female/Male, 16-256 Fibers (Base-16)
  • OS2 9/125μm, G.657.A1
  • Insertion loss ≤0.35dB, return loss ≥65dB
  • Straight Through/Crossover/Cross Pair polarity
  • Plenum (OFNP)/LSZH
  • Minimum bend radius 10mm
  • Stock lengths from 2m (7ft) to 30m (98ft), custom lengths on request

Specifications

Part NumberXXMTPSMF
ManufacturerHT
Connector AUS Conec MTP® Elite Female/Male
Connector BUS Conec MTP® Elite Female/Male
Fiber ModeOS2 9/125μm
Wavelength1310/1550nm
Glass FiberG.657.A1
Minimum Bend Radius10mm
Polish TypeAPC to APC
PolarityStraight Through/Crossover/Cross Pair
Cable JacketPlenum (OFNP)/LSZH
Cable StructureDouble Jacket
Fiber Count16-256 Fibers (Base-16)
Trunk Outside Diameter (OD)3.6-18.8mm
Breakout Outside Diameter (OD)3.0mm
Breakout Length0.84m
Insertion Loss≤0.35dB
Return Loss≥65dB
Attenuation at 1310nm≤0.35dB/km
Attenuation at 1550nm≤0.21dB/km
Long-term Tensile Load100-200N
Short-term Tensile Load300-660N
Operating TemperatureOFNP: -10 to 60°C (14 to 140°F)LSZH: -10 to 70°C (14 to 158°F)
Storage TemperatureOFNP: -10 to 70°C (14 to 158°F)LSZH: -20 to 70°C (-4 to 158°F)

Applications

This trunk is designed for permanent backbone positions: between patch panels, from the core to aggregation rows, or between buildings on a campus. The 16-fiber interface matches 400G SR8 optics, where all 16 fibers carry active transmit and receive lanes. Every breakout leg is numbered, which simplifies documentation and troubleshooting.

Trunk Construction and Polarity

The assembly is engineered for one-pull installation: reinforced trunk body, protected breakout point and sequential leg labels. We can supply pulling socks, different breakout lengths and custom leg numbering to match your rack elevation drawings.

Ordering Information

Please reference XXMTPSMF in your enquiry. Our sales team can also advise on polarity, gender and jacket choices if your project documentation is not final yet.

Built to Your Spec

Our engineering team handles custom MPO/MTP assemblies daily. If the standard configuration does not match your link design, send us the requirement and we will build exactly what your network needs at factory-direct cost.

Logistics

We dispatch worldwide by international courier, with air and sea freight options for bulk orders. Goods can be sent collect on your courier account, and documentation for customs clearance is provided with every shipment.

How We Pack

Every cable is protected with dust caps and individual packaging before being boxed for shipment. Batch test reports and your own part number labels can be included in each bag.

 

Related Products

Fiber Optic UAE supplies Customized MTP-16 Trunk Cable, 16-256F, OS2 to data centers, ISPs and enterprises in Dubai, Abu Dhabi, Sharjah and across the Gulf region, with project support from our UAE office and production coordination from our Shenzhen factory.


UAE Fiber Optics

UAE office: Abu Dhabi,Al khaleej Al Arabi
Factory add: ZYT industrial area, Shiyan, Baoan district, Shenzhen, China 518000

Popular Products

  • Fiber Optic Patch Cord
  • Fiber Optic Pigtail
  • Fiber Optic Attenuator
  • Fiber Optic Patch Panel
  • Fiber Optic Adapter

Products Datasheet

PDF catalogues of our products to download or for general inquiry, please send an email to sales@huihongfiber.com for details.

Customer Support

For customer support, please leave email to sales@huihongfiber.com, we shall reply to you as soon as possible.